<div dir="ltr"><div class="gmail_extra"><div class="gmail_quote">On 24 April 2018 at 20:43, Nirmal Thacker <span dir="ltr"><<a href="mailto:nirmalthacker@gmail.com" target="_blank">nirmalthacker@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><div><div><div><div><div></div>I have a Tinc cluster of about 100 nodes, and they are all running tinc 1.1pre14.<br><br></div>I'd like to upgrade to tinc 1.1pre15.<br><br></div>Is there a suggested mechanism to do this while keeping the cluster up? <br>For instance can I simply automate the installation of tinc 1.1pre15 on each node and reload the existing configuration using 'tinc reload'<br></div></div></div></blockquote><div><br></div><div>AFAICT "tinc reload" will not restart your process, so you will still be running 1.1pre14. You will need to restart tincd to upgrade to 1.1pre15. This will cause a brief interruption of connectivity (around one second, typically, depending on setup) for the node that you're restarting.<br></div><div> </div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><div><div>Will the temporary state of having a mix set of 1.1pre14 and 1.1pre15 nodes cause any instabilities?<br></div></div></div></blockquote><br></div><div class="gmail_quote">Not that I know of - 1.1pre14 and 1.1pre15 should be compatible with each other.<br></div><br></div></div>